Collective Action
Protesters block roads under Cola bridge following Hariri's resignation
وطنية - أفاد مندوب "الوكالة الوطنية للاعلام" أن محتجين قطعوا الطريق تحت جسر الكولا بمستوعبات النفايات.
Date:
July 15, 2021
Actors/ Mobilising structures:
Collective / informal group
Multi-organisational field (collaboration, allies) :
N/A
Mode of Action:
Road blockade
Objective:
Reform (advocating for limited change in political, socio-economic etc.)
Cause/ Grievances/ Framing CA:
Policy Grievances
Spatial characteristics:
Location on the Lebanese territory
Frequency:
One off
State response:
N/A