Collective Action
Protesters block the Beddawi highway denouncing the deteriorating socioeconomic conditions
وطنية - البداوي - قطع محتجون طريق البداوي الدولية بالعوائق رفضا للأوضاع المعيشية الضاغطة.
Date:
July 13, 2021
Actors/ Mobilising structures:
Collective / informal group
Multi-organisational field (collaboration, allies) :
N/A
Mode of Action:
Road blockade
Objective:
Reform (advocating for limited change in political, socio-economic etc.)
Cause/ Grievances/ Framing CA:
Access to socio-eco rights
Policy Grievances
Spatial characteristics:
Location on the Lebanese territory
Frequency:
Episodic
State response:
N/A