Collective Action

Road Blockade at Burj el Ghazal-Ring intersection against Banks’ Policies, and the Army reopened the road

وطنية - أفاد مندوب "الوكالة الوطنية للاعلام" أن مجموعة من المحتجين توجهت إلى جسر الرينغ، وقطعت السير أمام برج الغزال، احتجاجا على "السياسة المصرفية المتبعة".
 

Date: 
March 5, 2020
Actors/ Mobilising structures: 
Collective / informal group
Multi-organisational field (collaboration, allies) : 
N/A
Mode of Action: 
Road blockade
Objective: 
Demands for rights/services
Protest of a policy/ governmental measure/ etc.
Revolutionary (seeking radical change across society/ political system)
Cause/ Grievances/ Framing CA: 
Access to socio-eco rights
Corruption
Policy Grievances
Spatial characteristics: 
Location on the Lebanese territory
Frequency: 
Continuous
State response: 
Repression

LBN11061

Village Name: 
BCD
Local Name: 
Beirut Central District
Caza: 
Associated HRV: 
14408